Case study – Maccaferri, paralink high strength geogrid for basal reinforcement

2016

Mr Ravinder Nag (Geosynthetics and Mining Business Unit Manager - Maccaferri Canada Ltd)

GOLDEX, VAL D’OR, QUEBEC, CANADAAUTHORS: Ravin Nag. Maccaferri Canada Ltd , PROBLEM:During the design and construction of ore stockpile facilities at the Goldex Mine, it was recognized that the ore stockpile pad and associated conveyer infrastructure would be situated over a deposit of soft clay. The proposed stockpile facility called for a 23m high ore stockpile situated on a 10m thick layer of engineered granular fill that contained the conveyer feed hoppers and machinery.The soft foundation clays were incapable of supporting this combined loading. Consolidation of the clay under the applied loads would result in differential and total settlements that would be detrimental to the operations of the mineSOLUTION:The project geotechnical engineers determined that the loading from the stockpile could be supported on the soft clay, provided that a reinforced granular foundation was built to improve the bearing capacity of the clay. A basal reinforcement structure would also control differential settlements, thereby allowing the stockpile infrastructure to settle uniformly.The basal platform was designed to be a minimum size of 65m x 65m. A multi-layer system was explored, which featured 6 layers of an HDPE punched and extruded geogrid. The number of layers required was based upon the low strength of the HDPE. Each layer had to be separated by a layer of compacted gravelly sand engineered fill.Working with Maccaferri Canada Ltd, the designer also investigated the use of Paralink® soil reinforcement, Maccaferri’s high performance polyester geogrid. Due to the physical performance of the grid, it was determined that two layers of Paralink® 600 laid perpendicular to each other, would provide the reinforcement needed. No engineered fill was required between the layers.The Paralink® option resulted in a 60% reduction in the quantity of reinforcement required for the platform. The calculation was done using Maccaferri design software. The reduction in reinforcement also resulted in an increase in the speed of installation, thus reducing the overall cost of the platform. A two week schedule was allocated for the construction of the basal reinforcement platform. This was considered very tight for the multi-layer option. Using 2 layers of the Paralink® 600, the platform was built in 11 days.
$20.00